Insulate Underground Pipes

STEP

1

Read the Catalogue & Manual

  1. Free the tube as well as possible of soil, sand and any other materials.
  2. At regular intervals lay a little wooden block beneath the pipe, so that the bottom of the pipe is also insulated.
  3. Moisten the pipe with the plant sprayer. This will give you a better adhesion. It also shortens the curing time.

STEP

2

Preparation

  1. Shake the can very carefully.
  2. Spray a thin layer of PUR 7 all around the pipe, beginning at the bottom.

STEP

3

Bonding the Skirting

  1. Apply a generous quantity of TEC 7 to the back of the skirting.
  2. Press the skirting against the substrate. Position it correctly.
  3. Apply brief and powerful pressure. It is unnecessary to clamp the skirting in place or exert permanent pressure.

STEP

4

Finishing

  1. After around 2 hours the foam is cured and it can be covered.
  2. You can remove uncured PUR foam with PUR 7 Cleaner and Tec 7 Cleaner.
  Find a Local Tec7 Retailer

Would you like to stock our products?

Join over 1800 retailers selling Tec7 products in Ireland and the UK